Widening, straightening, embankment work, conduit reconstruction, levees, drainage structures, public and private utilities relocation, bridges, street construction, and appurtenant flood control measures to protect persons and property in the Perry Creek Valley. The project started at the Missouri River and continued north upstream to the city limits. Phases 1 through 4 are complete. The Phase 4 Levee raise was completed to 23rd Street in 2012.
-->